National Liberation Front party – FLN
Draft development programme for the People’s Assembly of the Wilaya of Algiers
Plan for fair development and solidarity between municipalities — 2026–2031
Political and development edition – 57 municipal cards – funding and cost study
Working translation — the Arabic original prevails. العربية
Implementation and method note
This document is a proposed political and development programme; it is neither an approved implementation plan nor an official statement of needs. The projects listed for each municipality are interventions put forward for study: they do not prove a shortfall, approve a project or allocate funding.
Accuracy rule: no population, health, education or financial figure is given at municipal level unless it is tied to an official source, a reference year and matching geographic boundaries. The 2008 census (RGPH 2008) data are historical and do not represent the 2026 population.
Administrative organisation used in this edition: 13 administrative districts and 57 municipalities, under presidential decree 26-112 of 8 March 2026, published in Official Journal no. 19 of 12 March 2026.
1. Legal framework and the Assembly’s powers
The programme rests on Law no. 12-07 on the wilaya, in particular the articles governing the contribution of the People’s Assembly of the Wilaya to economic, social and cultural development, solidarity between municipalities, health, youth and sport, heritage, tourism, the environment, housing and land planning.
The programme distinguishes between: (a) projects that the wilaya initiates or funds from its own budget within its powers; (b) sector projects proposed for registration with the State and the ministries; (c) municipal projects that require agreements and coordination; (d) projects of public bodies and national networks.
The Assembly debates and adopts the wilaya’s budget, while the wali prepares the draft budget and carries it out as authorising officer, as the law provides. Commitments are therefore worded as initiative, deliberation, proposal, coordination and oversight, without going beyond the Assembly’s powers.
2. The statistical base: what is available and what must be completed
Core statistical references: the National Office of Statistics (ONS), the results of the 2008 General Census of Population and Housing (RGPH 2008), the Armature urbaine publication; the statistical yearbook of the Wilaya of Algiers; the bulletins of the education, health, transport and environment directorates; the wilaya’s administrative account, initial budget and supplementary budget.
The 2008 figures are treated as a historical reference only. The number of settlements or neighbourhoods in the ONS tables does not necessarily add up to a municipality’s total population. The total population table for each municipality must be taken from the ONS database or a recent official record before investments are allocated.
A recent indicator usable after verification: on 20 September 2026 the Wilaya of Algiers announced that its school estate had reached 1,724 establishments after 36 new ones opened out of a programme of 125, that 97 extension classrooms out of 114 had opened, and that school canteens numbered 491. These are wilaya-wide totals, not a breakdown by municipality.
The open sources that were checked offer no consistent, recent, published base for all 57 municipalities on population, health, transport, waste and unemployment. Those fields are therefore not filled in by guesswork.
3. The data card required for each municipality
| Area | Indicator required | Source for verification |
|---|---|---|
| Population | Population at the latest official year, households, age groups, density | ONS / civil registry / wilaya services |
| Education | Number of schools by level, pupils, classes, overcrowding rate, canteens | Education directorate |
| Health | Clinics, treatment rooms, beds, doctors, access time | Health directorate and health establishments |
| Transport | Lines, trips, passengers, coverage, access time, bottlenecks | Transport directorate and transport operators |
| Roads | Road length by condition, pavements, lighting, accidents | Public works directorate and municipality |
| Water and sanitation | Connection rate, leaks, blockages, outfalls, storm-water drainage | ADE / ONA / water resources directorate |
| Environment | Waste collected, black spots, sorting, water and air quality | Netcom / Extranet / environment directorate |
| Social and employment | Registered unemployment, benefits, people with special needs, older people | Employment and social action directorates |
| Finances | Municipal budget, collection, spending, debts, outstanding projects | Municipality / Treasury / wilaya |
4. The proposed fair-development index
The shortfall index is scored out of 100 points, with the highest scores going to the municipalities with the largest shortfall. No ranking is published before the data are complete and audited.
The ranking thresholds are set after calibrating the index on real data. The preset 70/40 split is not applied automatically before the distribution of results has been tested, so as not to produce an artificial ranking.
5. Proposed project cards for the 57 municipalities
Each card contains a diagnosis and a set of candidate interventions. All are subject to a site visit, a technical study, a check of the land and the naming of the project owner and the funding before registration.
7. The financial plan: cost estimates and funding sources
No reliable overall envelope can be set before reviewing the wilaya’s initial and supplementary budgets and administrative account, previous commitments, commitment authorisations and payment appropriations, and the list of registered sector projects. This edition therefore uses an auditable costing method instead of assumed overall figures.
7.1 How the cost of each project is calculated
- Initial cost = quantities of works measured on site × the reference unit prices set in the specifications or price schedule, plus studies, supervision and technical inspection.
- Where relevant, the costs of expropriation or clearing the land, moving networks, connections, outdoor works, equipment, testing and handover are added.
- A risk allowance justified by the study is included, not an arbitrary flat percentage, keeping investment cost separate from operating and maintenance costs.
- The annual financial impact is calculated: commitment authorisations for the whole project and payment appropriations according to the works schedule, with the source of each tranche.
- The cost is revised after the preliminary study and then the detailed study, and updated before the contract is launched.
7.2 Projects by cost category
| Category | Examples | How it is estimated |
|---|---|---|
| Local upkeep and maintenance | Lighting, pavements, gardens, repairing road sections | Survey of quantities, lengths and areas, and unit prices |
| Local facilities | Local pitch, youth centre, extending a school or clinic | Functional brief, floor area, equipment, connections and networks |
| Projects shared by two or more municipalities | Waste transfer station, link road, shared facility | Study of flows, capacity, land, networks, operating cost |
| Structural wilaya projects | Transport, sanitation, protecting a river or the coast | Feasibility study of several options and environmental and social assessment |
7.3 Possible funding sources and their conditions
| Source | How it is mobilised |
|---|---|
| The wilaya’s budget | Funding operations within the wilaya’s powers and financial capacity, after adoption. |
| State sector programmes | Registering projects with the ministry or sector directorate; not guaranteed before registration and notification. |
| The Solidarity and Guarantee Fund for Local Authorities | Applying for equipment and investment grants under the Fund’s conditions and priorities and the accepted files. |
| Municipal budgets | A contribution from one or more municipalities, according to their deliberations, capacities and legal agreements. |
| Public bodies and networks | Funding or delivery through ADE, ONA, transport and environment bodies and others, according to their powers and agreements. |
| Economic partnerships | Used only where the law, public procurement and relevant concessions allow, protecting public property and competition. |
| Cooperation programmes | Each project’s eligibility, funding conditions and maintenance and sustainability obligations are studied before it is included. |
The Ministry of the Interior states that the Solidarity and Guarantee Fund for Local Authorities contributes to equipment and investment grants and funds local and national programmes, including school transport, water and some income-generating projects. Actual access remains subject to the programmes’ conditions and financial decisions.
7.4 The proposed allocation rule
- 60% proven development shortfall
- 20% population and pressure on facilities
- 10% geographic and economic specificity
- 10% social needs
After calculating the shortfall index and checking cost and feasibility, the following rule is proposed for sharing out the municipal envelope that can be allocated: 60% according to the proven development shortfall; 20% according to population and pressure on facilities; 10% according to geographic and economic specificity; 10% according to social needs. This is a rule for discussion, not a legal rule. Shared projects get a separate portfolio, so that beneficiaries are not counted twice.
8. The first 100 days
- Days 1–15
Form a technical, legal and financial coordination team, and name contact points in the districts and municipalities.
- Days 16–30
Request the budgets, administrative accounts, lists of registered and stalled projects, contracts and debts.
- Days 31–45
Launch a single form and an on-site survey of facilities, networks, roads and black spots.
- Days 46–60
Build the first map of disparities and check the data sources and how far back they go.
- Days 61–75
Hold public hearings with the municipalities, associations, sectors and professionals.
- Days 76–90
Draw up the list of candidate projects, the initial cost cards and the bodies responsible.
- Days 91–100
Publish an initial diagnosis report, the priority matrix and the table of projects ready for registration.
9. Governance, transparency and performance indicators
- Publish a card for every project: location, beneficiaries, project owner, funding source, approved cost, deadlines, progress, contractor where relevant, and difficulties.
- Publish a progress report every three months, an annual financial statement, a mid-term evaluation and a final report.
- Use outcome indicators, not just the number of projects: access time to services, transport coverage, kilometres of roads rehabilitated, number of flood points treated, waste sorting rate and school overcrowding rate.
- Track the gap between municipalities at the start and end of the term, using the same definitions, method and data.
- Provide a way to receive citizens’ comments, publishing the replies and their status without revealing personal data.
10. Measurable targets by the end of the term
| Indicator | Proposed operational target | Condition for adoption |
|---|---|---|
| Diagnosis coverage | 57 audited municipal cards | Technical validation of the data |
| Projects | A technical and financial card for every project proposed for registration | Study, quantities, land and project owner |
| Transparency | A monitoring report every three months | Publishing verifiable data |
| Budget | Tracking commitment authorisations, payment appropriations and delivery | Matching the official accounts |
| Fair development | Measuring how the gaps between municipalities change | One index, before and after |
| Shared projects | Delivering approved shared projects on time | Agreements and confirmed funding |
11. Reference sources
- National Office of Statistics ONS, Armature urbaine – RGPH 2008, Collection Statistique no. 163/2011 www.ons.dz (opens another site)
- Official Journal no. 19 of 2026, presidential decree 26-112 of 8 March 2026 www.joradp.dz (opens another site)
- Law on the wilaya no. 12-07 of 21 February 2012, Official Journal no. 12 www.commerce.gov.dz (opens another site)
- Wilaya of Algiers, the school estate – 20 September 2026 wilaya-alger.dz (opens another site)
- Ministry of the Interior and Local Authorities, support for the social and economic development of municipalities interieur.gov.dz (opens another site)
- Ministry of the Interior and Local Authorities, contributions of the Solidarity and Guarantee Fund for Local Authorities interieur.gov.dz (opens another site)
Conclusion
This project rests on one principle: fair development does not mean sharing money out equally, but directing resources according to the proven shortfall, the number of beneficiaries, the expected impact and the capacity to deliver and maintain. Every municipal card can be updated once the official statistics and the technical and financial study are complete.
One wilaya, 57 municipalities, balanced development and an equal right to public services.
National Liberation Front party – FLN | Draft programme proposed for the People’s Assembly of the Wilaya of Algiers 2026–2031